CLIENT LOGIN | 866.851.3255

| BUILDING | |
| Total Size | 38,400 sq. ft. - two-story building |
| Construction | Hardened poured concrete structure & brick; Hard rock, steel mesh intrusion proofing |
| Windows | No exterior windows in computer area |
| FLOOR SPACE | |
| Data Center Floor | 2,000 sq. ft. of 18" raised floor space |
| Office Space | Desks, offices and conferences rooms available for hourly, daily or contracted periods |
| COMMUNICATIONS | |
| Carriers | Neutral providers with access to major carriers (AT&T and SBC) |
| Carrier Services | From low-speed 56k to high speed OC12 and higher |
| Internal Cabling | Copper or fiber access to carrier bandwidth using cable management trays throughout the building |
| External Cabling | Dual entrances into building |
| POWER | |
| Power to Facility | Dual feed, single grid power from Kansas City Power & Light |
| UPS | 650 KVA system |
| Generated Power | Redundant battery-based UPS system |
| Fuel Reserve | 350 Kw Caterpillar diesel generator with pre-wiring for secondary drive-up generator 500 gallons fuel on site |
| ENVIRONMENTAL | |
| All Systems | N+1 HVAC configuration (Liebert Units) |
| Air Handling | Redundant HVAC system |
| Air Quality | Air temperature delivered under floor at 69° ± 6° with humidity at 40% ± 10% |
| Water Detection | Leak detection under all raised floor |
| FIRE PROTECTION | |
| Data Center Area | FM200 gas |
| Office Area | Standard water system |
| Smoke Detection | Smoke sensors above and below raised floor |
| PHYSICAL SECURITY | |
| Entrances | Card key door systems and biometric hand scanners for computer area access |
| Closed Circuit Video | Multi cameras on site - inside and out Digitally recorded.
|
| FACILITY MONITORING | |
| Facility Engineers | Facility engineers available by pager. Engineers trained to control and maintain all critical facility components. |
| Power Management | Critical power system controlled by automated management system, which controls all switching. All alarm situations are paged to trained facility engineers |
| Environment Management | Air temperature, humidity, fire detection and water pressure all managed by automated control system, which pages all alert situations. |
| Water Detection | Leak detection under all raised floor |