| BUILDING | |
| Total Size | 35,000 sq. ft. single-story building |
| Construction | Reinforced poured concrete floor, structural steel beam with brick facade |
| Shipping/Receiving | Large truck (18 wheeler) docks and small truck docks are able to support all of your shipping requirements. Secured Receiving area designated for customer owned equipment. |
| FLOOR SPACE | |
| Total Raised Floor | 62,000 sq. ft. of 18" raised floor |
| Office Space | 26,000 sq. ft. including 500 workstations, private offices, conference rooms and common area |
| COMMUNICATIONS | |
| Carriers | Neutral providers with access to major carriers
(AT&T, SBC, MCI, Quest, Level III, Everest. Other dark fiber available.
|
| Carrier Services | From low speed 56kbps to Optical carrier level services are available. |
| Internal Cabling | Copper or fiber access to carrier bandwidth using cable management trays throughout building. |
| External Cabling | Dual entrances into building including multiple CO redundancy and fiber access to primary carriers. |
| POWER | |
| Power to Facility | Dedicated grid from local power company UPS - 160kVA PowerWare redundant UPS in N+1 configuration
|
| Generated Power | 1,750 kW caterpillar diesel generator roll-up access for an additional 400kW generator |
| Fuel Reserve | 6,000 gallons fuel on site. 4 days at max load |
| Power Cabling | All power cabling below floor is waterproof conduit encased with waterproof connectors to equipment |
| All Systems | Supported by 24x7x365 computer monitoring and facility engineers |
| COOLING | |
| Air Handling | Redundant HVAC system |
| Air Quality | Air temperature delivered under floor at 69° ± 6° with humidity at 40% ±10%. |
| Water Detection | Leak detection under all raised floor. |
| FIRE PROTECTION | |
| Smoke & Heat Detection | Smoke sensors above and below raised floor. |
| Multi-Stage Protection | Dry pipe system requires alert from two sensors, which activates pipe fill and a final stage when the temperature exceeds threshold. |
| PHYSICAL SECURITY | |
| Entrances | All building entrances require card key access. Primary computer area requires card key and biometric authentication |
| Security Guards Closed Circuit Video |
16 cameras cover outside of building, all entrances, alternate workspace, and computer room. |
| FACILITY MONITORING | |
| Facility Engineers | Facility engineers on site and available by pager. Engineers trained to control and maintain all critical facility components. |
| Power Management | Critical power systems are monitored and controlled automated management system. |
| Environment Management | Air temperature, humidity, fire detection and water pressure managed by automated control system, which pages all alert situations. |